Pinellas County Projects
Pinellas County is always working on projects to preserve and improve infrastructure, support our economy and meet the needs of the public. Major projects are listed below.
Beach and Coastal Projects
Construction: Completed




Emergency Beach Erosion Control Project
Multiple, see map



Grand Canal (Dents Channel) Dredging
Dents Channel in Tierra Verde



Pass-a-Grille Beach Nourishment
Pass-a-Grille BeachConstruction: Not started
2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.Design: Completed
2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.Design: In progress




Madeira Beach Access Parking Area
14400 Gulf Blvd, Madeira Beach, FL 33708Bridge Projects
Construction: Completed




Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.Construction: In progress




Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivisionConstruction: Not started
Design: Completed
Design: In progress




Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon SpringsDesign: Not started




Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward IslandFacility Construction
Construction: Completed




Bayside Health Clinic Expansion and Renovation Overview
14808 49th Street North Clearwater, FL 33762Design: In progress




St. Pete-Clearwater Airport Terminal Improvement
14700 Terminal Blvd., Clearwater, FL 33762Intersection Improvements
Construction: In progress




Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.Design: Not started




Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in ClearwaterKeystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East LakeStudy: Completed
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East LakeParks Projects
Construction: Completed




Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains openConstruction: In progress




Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)
12700 119th Street N., Largo, FL 33778Construction: Not started
Design: Completed




Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683Design: In progress




Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.Roadway and Drainage Projects
Design: Completed
Design: In progress




Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery BayouStudy: Completed




Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19Roadway Improvements
Construction: Completed




22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)Design: Completed
Design: In progress




Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor



Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)
Forest Lakes Blvd. between SR 580 and SR 584/Tampa Road



West Bay Drive Improvements
West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo



Nebraska Avenue Roadway Improvements
Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor



102nd Avenue N. Roadway Improvements
102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.Design: Not started
Design: On hold





62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.Study: Completed




62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)
62nd Avenue N., between 49th Street N. and 34th Street N.




62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.Study: In progress
Whitney Road Complete Streets Project
Whitney Road from US 19 to Bolesta RoadSidewalk Projects
Construction: Completed




Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)
Starkey Road between Ulmerton Road and East Bay Drive



Mehlenbacher Road Sidewalk Improvements
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair BluffsConstruction: In progress




Safe Routes To School
Multiple, see community-specific infoDesign: Completed




46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)
46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street NorthStormwater and Drainage Projects
Construction: In progress




Roosevelt Creek Channel 5 Improvements
Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in ClearwaterDesign: In progress
Study: In progress




Flood Mitigation Action Plan
Multiple, see mapTrail Projects
Construction: In progress




Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge
Pinellas Trail, over the Lake Tarpon outfall canalDesign: In progress




Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in LargoUtilities
Construction: Completed
Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation
Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole53rd Avenue North Force Main Replacement
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.Construction: In progress
Manufactured Housing Communities Utility System Replacement
13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.Pass-A-Grille Water Main Improvement
St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue62nd Street North Force Main Replacement
62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.Design: In progress
Lake Tarpon Septic-to-Sewer Conversion
Three communities northeast of Lake Tarpon.Gulf Beach Water Booster Station Improvements
The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach96th Place Sewer Main Replacement
96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.173rd to 176th Ave East Redington Neighborhood Water Main Replacement
The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.54th Avenue North Road Force Main Replacement
54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.Duhme Road Force Main Replacement
Duhme Road from American Legion Drive to 53rd Avenue NorthKlosterman Road Force Main Replacement
The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19Implementation: In Progress
Digital Meter Upgade
Unincorporated Pinellas CountyStudy: In progress
Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde
Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.Beach and Coastal Projects




Emergency Beach Erosion Control Project
Multiple, see map
Status: Construction: Completed




Grand Canal (Dents Channel) Dredging
Dents Channel in Tierra Verde
Status: Construction: Completed




Pass-a-Grille Beach Nourishment
Pass-a-Grille Beach
Status: Construction: Completed




Madeira Beach Access Parking Area
14400 Gulf Blvd, Madeira Beach, FL 33708
Status: Design: In progress
2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.
Status: Design: Completed, Construction: Not started
Bridge Projects




Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon Springs
Status: Design: In progress




Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward Island
Status: Design: On hold




San Martin Boulevard Bridge Replacement
Tallahassee Drive to Weedon Drive in St. Petersburg
Status: Design: In progress




Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.
Status: Construction: Completed




Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivision
Status: Construction: In progress





13th Street/Sands Point Drive Bridge Replacement
13th Street S., near 3rd Avenue S. in Tierra Verde
Status: Design: Completed, Construction: Not started




Old Coachman Road Bridge Replacement
Old Coachman Road, north of Sharkey Road
Status: Construction: In progress
Facility Construction




Bayside Health Clinic Expansion and Renovation Overview
14808 49th Street North
Clearwater, FL 33762
Status: Construction: Completed




St. Pete-Clearwater Airport Terminal Improvement
14700 Terminal Blvd., Clearwater, FL 33762
Status: Design: In progress
Intersection Improvements




Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in Clearwater
Status: Design: Not started




Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.
Status: Construction: In progress
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East Lake
Status: Design: In progress, Study: Completed
Parks Projects




Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683
Status: Design: Completed




Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains open
Status: Construction: Completed




Raymond H. Neri Community Park Improvements
4303 46th Ave. N., St. Petersburg, FL 33714
Status: Construction: In progress
Brooker Creek Preserve Boardwalk Rehabilitation
3940 Keystone Rd, Tarpon Springs, FL 34688
Status: Construction: Completed




Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.
Status: Design: In progress





High Point Community Park
On the site of the former High Point Elementary School
Status: Construction: In progress





Dansville Community Park
Wilcox Road, between Jackson Street and Pine Street
Status: Construction: In progress
Sawgrass Lake Park Boardwalk & Tower Rehabilitation
7400 25th St. N., St. Petersburg, FL 33702
Status: Construction: Completed
Brooker Creek Preserve – Four Lakes Hammock Recreation Area
Brooker Creek Preserve
Status: Design: In progress




Weedon Island Preserve Salt Marsh Restoration
Weedon Island Preserve
Status: Construction: In progress
Taylor Lake Seawall Improvements
1100 8th Ave. SW,
Largo, Florida 33770
Status: Construction: Completed




Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)
12700 119th Street N., Largo, FL 33778
Status: Construction: In progress
Weedon Island Boardwalk and Pier Rehabilitation
Weedon Island Preserve
Status: Construction: In progress
Roadway and Drainage Projects




Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery Bayou
Status: Design: In progress




Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19
Status: Study: Completed
Indian Rocks Road Improvements
Indian Rocks Road, Kent Drive to 8th Avenue SW
Status: Design: Completed
Roadway Improvements




East Lake Road Corridor
East Lake Road from south of Curlew Road to north of Trinity Boulevard
Status: Design: Not started




Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor
Status: Design: In progress




Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)
Forest Lakes Blvd. between SR 580 and SR 584/Tampa Road
Status: Design: In progress




West Bay Drive Improvements
West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo
Status: Design: In progress




Nebraska Avenue Roadway Improvements
Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor
Status: Design: In progress




71st Street North Roadway Improvements
71st Street N., between 38th Avenue N. and 54th Avenue N.
Status: Construction: In progress




102nd Avenue N. Roadway Improvements
102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.
Status: Design: In progress
Whitney Road Complete Streets Project
Whitney Road from US 19 to Bolesta Road
Status: Study: Completed




62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)
62nd Avenue N., between 49th Street N. and 34th Street N.
Status: Study: Completed




54th Avenue N. Improvements
54th Avenue N., from 49th Street N. to 34th Street N.
Status: Design: Completed





62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.
Status: Study: Completed, Design: On hold




22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)
Status: Construction: Completed
Sidewalk Projects




46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)
46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street North
Status: Design: Completed




Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)
Starkey Road between Ulmerton Road and East Bay Drive
Status: Construction: Completed




Mehlenbacher Road Sidewalk Improvements
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair Bluffs
Status: Construction: Completed




Safe Routes To School
Multiple, see community-specific info
Status: Construction: In progress
Stormwater and Drainage Projects




Baypointe Stormwater Conservation Area
Seminole area formerly known as the Baypointe Golf Course
Status: Design: In progress




Flood Mitigation Action Plan
Multiple, see map
Status: Study: In progress




Roosevelt Creek Channel 5 Improvements
Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in Clearwater
Status: Construction: In progress
Cherokee Drive Drainage Improvements
Cherokee Drive/48th Avenue N. area in unincorporated Seminole
Status: Study: In progress
Trail Projects




Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge
Pinellas Trail, over the Lake Tarpon outfall canal
Status: Construction: In progress




Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo
Status: Design: In progress, Construction: In progress
Utilities
Digital Meter Upgade
Unincorporated Pinellas County
Status: Implementation: In Progress
Manufactured Housing Communities Utility System Replacement
13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.
Status: Construction: In progress
Lake Tarpon Septic-to-Sewer Conversion
Three communities northeast of Lake Tarpon.
Status: Design: In progress
Pass-A-Grille Water Main Improvement
St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue
Status: Construction: In progress
Gulf Beach Water Booster Station Improvements
The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach
Status: Design: In progress
Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation
Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole
Status: Construction: Completed
53rd Avenue North Force Main Replacement
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.
Status: Construction: Completed
62nd Street North Force Main Replacement
62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.
Status: Construction: In progress
96th Place Sewer Main Replacement
96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.
Status: Design: In progress
173rd to 176th Ave East Redington Neighborhood Water Main Replacement
The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.
Status: Design: In progress
54th Avenue North Road Force Main Replacement
54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.
Status: Design: In progress
Duhme Road Force Main Replacement
Duhme Road from American Legion Drive to 53rd Avenue North
Status: Design: In progress
Klosterman Road Force Main Replacement
The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19
Status: Design: In progress
Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde
Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.
Status: Study: In progress




102nd Avenue N. Roadway Improvements
102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.Status: Design: In progress
Type: Roadway Improvements





13th Street/Sands Point Drive Bridge Replacement
13th Street S., near 3rd Avenue S. in Tierra VerdeStatus: Design: Completed, Construction: Not started
Type: Bridge Projects
173rd to 176th Ave East Redington Neighborhood Water Main Replacement
The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.Status: Design: In progress
Type: Utilities
2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.Status: Design: Completed, Construction: Not started
Type: Beach and Coastal Projects




22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)Status: Construction: Completed
Type: Roadway Improvements




46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)
46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street NorthStatus: Design: Completed
Type: Sidewalk Projects
53rd Avenue North Force Main Replacement
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.Status: Construction: Completed
Type: Utilities




54th Avenue N. Improvements
54th Avenue N., from 49th Street N. to 34th Street N.Status: Design: Completed
Type: Roadway Improvements
54th Avenue North Road Force Main Replacement
54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.Status: Design: In progress
Type: Utilities




62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)
62nd Avenue N., between 49th Street N. and 34th Street N.Status: Study: Completed
Type: Roadway Improvements





62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.Status: Study: Completed, Design: On hold
Type: Roadway Improvements
62nd Street North Force Main Replacement
62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.Status: Construction: In progress
Type: Utilities




71st Street North Roadway Improvements
71st Street N., between 38th Avenue N. and 54th Avenue N.Status: Construction: In progress
Type: Roadway Improvements
96th Place Sewer Main Replacement
96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.Status: Design: In progress
Type: Utilities




Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19Status: Study: Completed
Type: Roadway and Drainage Projects




Baypointe Stormwater Conservation Area
Seminole area formerly known as the Baypointe Golf CourseStatus: Design: In progress
Type: Stormwater and Drainage Projects




Bayside Health Clinic Expansion and Renovation Overview
14808 49th Street North Clearwater, FL 33762Status: Construction: Completed
Type: Facility Construction




Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon SpringsStatus: Design: In progress
Type: Bridge Projects




Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in ClearwaterStatus: Design: Not started
Type: Intersection Improvements
Brooker Creek Preserve – Four Lakes Hammock Recreation Area
Brooker Creek PreserveStatus: Design: In progress
Type: Parks Projects
Brooker Creek Preserve Boardwalk Rehabilitation
3940 Keystone Rd, Tarpon Springs, FL 34688Status: Construction: Completed
Type: Parks Projects
Cherokee Drive Drainage Improvements
Cherokee Drive/48th Avenue N. area in unincorporated SeminoleStatus: Study: In progress
Type: Stormwater and Drainage Projects




Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery BayouStatus: Design: In progress
Type: Roadway and Drainage Projects





Dansville Community Park
Wilcox Road, between Jackson Street and Pine StreetStatus: Construction: In progress
Type: Parks Projects
Digital Meter Upgade
Unincorporated Pinellas CountyStatus: Implementation: In Progress
Type: Utilities
Duhme Road Force Main Replacement
Duhme Road from American Legion Drive to 53rd Avenue NorthStatus: Design: In progress
Type: Utilities




Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward IslandStatus: Design: On hold
Type: Bridge Projects




East Lake Road Corridor
East Lake Road from south of Curlew Road to north of Trinity BoulevardStatus: Design: Not started
Type: Roadway Improvements




Emergency Beach Erosion Control Project
Multiple, see mapStatus: Construction: Completed
Type: Beach and Coastal Projects




Flood Mitigation Action Plan
Multiple, see mapStatus: Study: In progress
Type: Stormwater and Drainage Projects




Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)
Forest Lakes Blvd. between SR 580 and SR 584/Tampa RoadStatus: Design: In progress
Type: Roadway Improvements




Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains openStatus: Construction: Completed
Type: Parks Projects




Grand Canal (Dents Channel) Dredging
Dents Channel in Tierra VerdeStatus: Construction: Completed
Type: Beach and Coastal Projects
Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation
Oakdale Terrace, Johnson Road, and Grove Terrace in SeminoleStatus: Construction: Completed
Type: Utilities
Gulf Beach Water Booster Station Improvements
The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete BeachStatus: Design: In progress
Type: Utilities





High Point Community Park
On the site of the former High Point Elementary SchoolStatus: Construction: In progress
Type: Parks Projects
Indian Rocks Road Improvements
Indian Rocks Road, Kent Drive to 8th Avenue SWStatus: Design: Completed
Type: Roadway and Drainage Projects




Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.Status: Design: In progress
Type: Parks Projects
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East LakeStatus: Design: In progress, Study: Completed
Type: Intersection Improvements
Klosterman Road Force Main Replacement
The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19Status: Design: In progress
Type: Utilities
Lake Tarpon Septic-to-Sewer Conversion
Three communities northeast of Lake Tarpon.Status: Design: In progress
Type: Utilities




Madeira Beach Access Parking Area
14400 Gulf Blvd, Madeira Beach, FL 33708Status: Design: In progress
Type: Beach and Coastal Projects




Madonna Boulevard Bridge Replacement
Madonna Boulevard in Tierra VerdeStatus: Design: In progress
Type: Bridge Projects
Manufactured Housing Communities Utility System Replacement
13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.Status: Construction: In progress
Type: Utilities




Mehlenbacher Road Sidewalk Improvements
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair BluffsStatus: Construction: Completed
Type: Sidewalk Projects




Nebraska Avenue Roadway Improvements
Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm HarborStatus: Design: In progress
Type: Roadway Improvements


North Pinellas County Reclaimed Water Booster Pump Station
Community: Palm Harbor- Fox Chase area Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor. See project map for details.Status: Design: Completed, Construction: Not started




Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivisionStatus: Construction: In progress
Type: Bridge Projects




Old Coachman Road Bridge Replacement
Old Coachman Road, north of Sharkey RoadStatus: Construction: In progress
Type: Bridge Projects




Pass-a-Grille Beach Nourishment
Pass-a-Grille BeachStatus: Construction: Completed
Type: Beach and Coastal Projects
Pass-A-Grille Water Main Improvement
St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd AvenueStatus: Construction: In progress
Type: Utilities




Philippe Park Improvements
2525 Philippe Parkway, Safety HarborStatus: Design: In progress
Type: Parks Projects




Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge
Pinellas Trail, over the Lake Tarpon outfall canalStatus: Construction: In progress
Type: Trail Projects




Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in LargoStatus: Design: In progress, Construction: In progress
Type: Trail Projects




Raymond H. Neri Community Park Improvements
4303 46th Ave. N., St. Petersburg, FL 33714Status: Construction: In progress
Type: Parks Projects




Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)
12700 119th Street N., Largo, FL 33778Status: Construction: In progress
Type: Parks Projects
Ridgemoor Boulevard Bridge Replacement
Ridgemoor Boulevard in East LakeStatus: Design: In progress
Type: Bridge Projects




Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm HarborStatus: Design: In progress
Type: Roadway Improvements




Roosevelt Creek Channel 5 Improvements
Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in ClearwaterStatus: Construction: In progress
Type: Stormwater and Drainage Projects




Safe Routes To School
Multiple, see community-specific infoStatus: Construction: In progress
Type: Sidewalk Projects




San Martin Boulevard Bridge Replacement
Tallahassee Drive to Weedon Drive in St. PetersburgStatus: Design: In progress
Type: Bridge Projects
Sawgrass Lake Park Boardwalk & Tower Rehabilitation
7400 25th St. N., St. Petersburg, FL 33702Status: Construction: Completed
Type: Parks Projects




Shore Drive Bridge Replacement
Shore Drive in Ozona/Palm HarborStatus: Design: In progress
Type: Bridge Projects




St. Pete-Clearwater Airport Terminal Improvement
14700 Terminal Blvd., Clearwater, FL 33762Status: Design: In progress
Type: Facility Construction




Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)
Starkey Road between Ulmerton Road and East Bay DriveStatus: Construction: Completed
Type: Sidewalk Projects
Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde
Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.Status: Study: In progress
Type: Utilities




Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683Status: Design: Completed
Type: Parks Projects
Taylor Lake Seawall Improvements
1100 8th Ave. SW, Largo, Florida 33770Status: Construction: Completed
Type: Parks Projects
Weedon Island Boardwalk and Pier Rehabilitation
Weedon Island PreserveStatus: Construction: In progress
Type: Parks Projects




Weedon Island Preserve Salt Marsh Restoration
Weedon Island PreserveStatus: Construction: In progress
Type: Parks Projects




West Bay Drive Improvements
West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of LargoStatus: Design: In progress
Type: Roadway Improvements




Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.Status: Construction: Completed
Type: Bridge Projects




Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.Status: Construction: In progress
Type: Intersection Improvements
Whitney Road Complete Streets Project
Whitney Road from US 19 to Bolesta RoadStatus: Study: Completed
Type: Roadway Improvements